Project Description
New Building Air Conditioning System Upgrade
Work completed by Separable Portion below
- General Separable Portion 1a, 1b, 1c, 1d, 1e and 1f
- Separable Portion 2a – Basement 1
- Separable Portion 2b – Basement 2-4
- Separable Portion 2c – Level 11 Plantroom, New BMS Core Infrastructure
- Separable Portion 3 – Levels 1, 2, 3, 4, 7 & 8
- Separable Portion 4 – Level 5 Partial Upgrade
- Separable Portion 5 – Level 6
- Separable Portion 6 – Level 9
- Separable Portion 7 – Level 10
- New Sandwich Smoke Exhaust System
Summary of equipment installed:
- 24 x Cosair Air Handling Units
- 2 x Smardt-PowerPax Chillers Model WA095
- BKB Pumps – 2 x CHW, 2 x CW, 2 x SCW & 1 HW
- 2 x Moorea E Condensing Boiler
- Cosair Hot Water and Cooling Coils (AHU)
- Aqua Snap Carrier Heat Pumps
- Mitsubishi VRF
- Temperzone PAC units
- 75 x Holyoake Variable Air Volume
- 43 x VLT HVAC VSD
- Refill Unit and Buffer Tank
- 13 x Fantech Fans ( Stair Pressurisation, Smoke Exhaust, Outside Air, Toilet, Pump Room, Kitchen Exhaust and General Air)
- Complete BMCS